Close

Services

Registration of General Repairing / Maintenance Service Supplier

Material submission for registration of general repairing service provision#.

A. New supplier - Material submission for registration

  1. Contribuição Industrial - Conhecimento de cobrança(M/8) - copy <most recently>;
  2. Não é devedor à fazenda RAEM - original/certified copy <Issue date of the documents must not exceed in 90 days counting from receipt date of application>;
  3. Certidão do registo commercial(if have) - original/certified copy <Issue date of the documents must not exceed in 90 days counting from receipt date of application>;
  4. Certidão de Conta Corrente de Contribuinte – copy(if have) <Issue date of the documents must not exceed in 90 days counting from receipt date of application>;
  5. DSSOPT registration certificate of Construções Urbanas(Execução de obras) or Construtor Civil (Execução de obras) – copy <in this year>;
  6. Company resume: Including the construction project list which has been implemented.
* Remarks: 

a. Only accept the local supplier in operating the business for more than one year.
b. Contribuição Industrial - Conhecimento de cobrança(M/8) – The activity code must include at least type 500020 and will be applied in IPM general repairing request for quotation list, between the range of MOP15,000 and MOP500,000.
c. Contribuição Industrial - Conhecimento de cobrança(M/8) –The activity code must include at least type 500030 or 500040 or 500090 and will be applied in IPM general repairing request for quotation list, under the range of MOP15,000.
d. The scope of general repairing mentioned including the works except air conditioning, high voltage, low voltage electrical works(electrical/electronic equipment, CCTV, audio-visual equipment & telephone/telecommunications equipment, etc.), glass, hardware/tools, blacksmiths, locksmiths, plumbing/drainage, painting, waterproofing, carpets and curtains works etc…or involving the items for multi type repairing works specified above.
e. Regarding the construction project (including the repairing works costing over MOP500,000), IPM will adopt the DSSOPT’s Systematization of tendering process of public works in selecting candidates for requesting for quotation.
f. The above information must be verified and accepted by IPM before considering as qualified supplier (Counting from receipt date of application, applicants must submit all materials within 30 days, otherwise will be deemed as abandonment.)

B. Material submission for annual renewal (Submit from January to March each year)

Material to be submitted for renewal application will be the same as mentioned above in item A point no.1 to point no.6. (If the information in item A point no.3 to point no.4 remains unchanged, the documents can be replaced by a declaration provided by the supplier instead). Above information must be verified and accepted by IPM before considering as qualified supplier consecutively.

C. Request for quotation process

MPI will select from the list of eligible suppliers (according to the type of service) and base on the existing legislation for inviting at least 3 companies to precede the tendering process.